Home / Resources
Resources

Learn from real projects

Case studies, webinar recordings, demos and events – filter by type or industry.

Case studyConstruction

Everton Stadium: £300,000 saved through digital rehearsal

Façade installation simulated, checked for reach and tested in VR before work on site.

Read the case study
Video · 13 minConstruction

Façade factory: from layout to work instructions

A full 3DEXPERIENCE walkthrough – layout, DfMA work stations, ergonomics, rate analysis and work instructions.

Watch the demo
Video · 7 minAutomotive

Migration Studio: DELMIA V5 to 3DEXPERIENCE

A body-in-white line migrated from DELMIA V5 to 3DEXPERIENCE. 7-minute demo.

Watch the demo
Case studyConstruction

Grange Hospital: 29 weeks of programme time identified

Digital validation of an offsite wall system, from one wall to a whole building.

Watch on LinkedIn
Case studyAerospace

Saab nEUROn: 13% lower cost on the first aircraft

Reconfigurable Flexapod tooling replaced fixed jigs for drone production.

Read the case study
Case studyAutomotive

Volvo Cars: prize-winning BIW-Util

Our DELMIA V5 extension for body-in-white won a Volvo Cars innovation prize.

Read the case study
Case studyMarine

Kleven: automated welding in the shipyard

DELMIA robotics and offline programming for welding at Kleven Maritime.

Read the case study
WebinarConstruction

What is really affecting data-centre construction?

Clip from our live webinar on repeatable, product-based data-centre delivery.

Watch on LinkedIn
WebinarConstruction

Industrialised offsite construction

How factory principles apply to offsite construction.

Watch on LinkedIn
WebinarIndustrial

Ergonomics: reduce errors, raise productivity

Why ergonomics belongs in the digital plan, with a chartered ergonomist.

Watch on LinkedIn
WebinarIndustrial

Building the factory of the future with AI and DELMIA

Oskar Lindahl on DELMIA Virtual Factory.

Watch on LinkedIn
VideoConstruction

Prefab walls: from delivery to installation

Simulating logistics for large volumes of prefab walls.

Watch on LinkedIn
VideoConstruction

Spot the problem before the crew arrives

What digital rehearsal catches when everything is already planned.

Watch on LinkedIn
VideoIndustrial

Robot welding, programmed offline

Robot cell simulation for heavy welding in 3DEXPERIENCE.

Watch the demo
EventConstruction

Digital Construction Week North

Talks on the £300,000 Everton saving and the 29-week Grange result.

Watch on LinkedIn

Can’t find what you need?

Ask us – we probably have an example from a project like yours.

Ricky CartwrightHead of Technology, UK · +44 7854 303 247
Michael WestergrenManaging Director, Sweden · +46 731 55 81 01